日立HGP电梯安装调试手册

2021/7/27 20:26:43点击:

日立HGP电梯安装调试手册

HGP 电梯安装调试手册 编号:GY081-05 P-1
前 言


本资料介绍 HGP 型电梯,该梯种以集成了变频控制和逻辑控制的 EV-ECD01(MCUB)
控制板、SCL 串行通讯系统和 RD-DMS01 变频门机系统作为电气的关键组成部分,并基本使
用了 GVF-Ⅱ型电梯的机械系统。
资料编写目的:随着 HGP 电梯的开发成功,在工程方面需要提供安装、调试、维修和
保养各项工作的技术说明。本资料是根据 HGP 电梯的技术特点,列出电梯在工程环节中所
需使用的资料。
HGP 电梯电气系统最大的特点是将 GVF-II 电梯中的 FMT(逻辑控制),TD3100(变频
控制),SCL-A(串行通讯)三个模块功能集成在一个板(MCUB 板)上,现场操作方法上有
较多不同,这方面的内容请参考 HGP 电梯《MCUB 板使用说明》、《艾默生变频器专用操作面
板使用说明》和手持编程器(GHP)《GHP 使用说明》;机械方面主要是使用同步电机,采用
了 2:1 吊挂方式,轿顶反绳轮、对重反绳轮、机房主机安装上存在不同,该部分的作业可
参照 NPM 进行。
由于 HGP 电梯在电气控制原理上与 GVF-Ⅱ、GVF-Ⅲ电梯有较多的相同点,又基本使
用 NPM 电梯的机械系统,所以本资料对于相同点不再进行叙述,只作出说明“与 XX 电梯
保持一致”。
本资料基本内容:
(1) HGP 电梯构成和技术特点。
(2) 安装部分。电气回路图的使用说明;控制柜及轿顶电器箱等重要电气部分的名
称、功能介绍;工程大、细线及地线的安装等。
(3) 调试部分。运行前需进行检查的电梯各项安装情况,控制柜绝缘测试、低速试
运行、变频门机的调试运行、层高测定操作、高速运行调试、平层精度调整等。
如有修改意见,请填写附页的《HGP 电梯调试手册改进意见表》(复印有效),传真
或直接交由工程本部工程技术科以作修改。
编写:孙德明


校对:郭志海
张 丹
审核
 批准
HGP 电梯安装调试手册 编号:GY081-05 P-1
目 录
一.HGP 电梯的技术概述··············································4
 1.技术构成及特点··················································4
 2. HGP 与 NPM、GVF-Ⅱ的简单比较········································4
 2.1 机械部分的不同点············································5
 2.2 电气方面不同部分的简单比较···································6
 3.HGP 电梯的规格················································7
二.HGP 电梯机械部分的安装···········································7
三.HGP 电梯电气部分的安装···········································7
 1.电气回路图的说明·················································7
 1.1 电气回路图的类别和内容·······································7
 1.2 控制柜对外的接线代号及用途···································8
 1.3 电气回路图的读图方法·········································8
 2.电梯电源参数······················································10
 3.控制柜概要······················································10
 3.1 控制柜尺寸及主要部件的安装图·································10
3.2 控制柜内部主要部件的名称和功能·······························11
3.3继电器RYBD板元件布置图···········································11
 4.轿顶电器箱元件布置图············································12
5.井道内器件、电缆的安装··········································13
 5.1 井道内器件的安装与接线······································13
 5.2 井道内电缆的安装············································13
 6. 厅外召唤箱的安装、接线及 DIP 开关的设置·························14
 7. 接地线作业·····················································14
 7.1 控制柜内接地线回路图········································14
 7.2 系统地线敷线图··············································15
 8. 其他敷线························································15
四.运行调试···························································15
 1. 运行前准备······················································15
 1.1 运行前检查·····················································15
1.2 控制柜绝缘测试·················································15
 1.2.1 准备工作··················································15
 1.2.2 测试方法··················································16
 1.2.3 各回路绝缘标准阻值········································16
 1.3 电压测试························································17
HGP 电梯安装调试手册 编号:GY081-05 P-3
标记 处数
 1.4 混杂电压检查····················································17
2. 变频门机的调整···················································17
2.1 机械调整···················································17
2.2 电气系统介绍····················································19
 3. 低速试运行······················································21
3.1 磁极位置校正····················································21
3.2 低速运行··················································21
3.3 安全回路的确认驶················································22
3.4 变频门机的门宽自检测············································23
 4. 高速试运行前检查和调整··········································23
 5. 高速试运行······················································23
5.1 层高测定························································23
 5.1.1 层高测定运行前的确定··········································23
 5.1.2 层高测定的操作顺序·············································23
 5.2 高速试运行······················································23
 5.3 电梯对重配置····················································24
5.4 平层调整························································24
 5.5 起动补偿调整····················································24
5.6 轿内负荷检测设置···············································24
 6. 起动舒适感调整··················································25
 7. 功能确认························································25
五.MCUB 板使用说明····················································25
 1. MCUB 板简介·····················································25
 2. 小键盘介绍·····················································27
 2.1 硬件介绍·······················································27
 2.2 一般操作·······················································27
 2.3 各状态解释·····················································28
六.艾默生变频器专用操作面板使用说明···································31
1. 操作面板硬件说明················································31
 2. 按键功能说明···················································32
3. 指示说明························································32
4. 键盘操作说明···················································33
 七.手持编程(GHP)操作说明············································34
 1.手持编程(GHP)硬件说明··········································34
HGP 电梯安装调试手册 编号:GY081-05 P-3
标记 处数
 2.按键功能说明·····················································35
 3.GHP 操作流程简介················································36
八.故障说明···························································36
 1.电梯故障的内部处理方式···········································36
 2.电梯故障代码表···················································37
 3.变频器故障代码表·················································38
 九.HGP 乘客电梯标准规格表················································39


文件下载:点击下载日立HGP电梯安装调试手册 (点击查看下载口令
    下载申明:(1)倍加信梯控提供的日立HGP电梯安装调试手册资料来源于网络收集整理,并免费提供下载日立HGP电梯安装调试手册不收取任何费用,若发现您的权益受到侵害,请立即联系我们,我们会立即删除日立HGP电梯安装调试手册资料。(2)倍加信梯控提供的日立HGP电梯安装调试手册资料仅供用户学习和参考,用户如果使用下载的日立HGP电梯安装调试手册资料造成任何损失与倍加信无关,日立HGP电梯安装调试手册资料最终以版权厂家提供原厂资料为准。(3)倍加信梯控免费提供大量日立电梯技术资料下载,欢迎收藏本站,底部右下角提供了搜索功能,倍加信人脸识别梯控、IC刷卡梯控、二维码梯控、指纹识别梯控、语音梯控、CPU梯控、ID卡梯控、手机乘梯、机器人乘梯等广泛应用于日立电梯,欢迎扫码二维码加个微信咨询或备用,再次感谢您在倍加信梯控免费下载日立电梯日立HGP电梯安装调试手册。