GVF-Ⅲ电梯安装调试手册
前 言
本资料介绍 GVF-Ⅲ型电梯,该梯种以集成了变频控制和逻辑控制的 EV-ECD 01(MCUB)
控制板、SCL 串行通讯系统和 RD-DMS01 变频门机系统作为电气的关键组成部分,并基本使
用了 GVF-Ⅱ型电梯的机械系统。
资料编写目的:随着 GVF-Ⅲ电梯的开发成功,在工程方面需要提供安装、调试、维
修和保养各项工作的技术说明。本资料是根据 GVF-Ⅲ电梯的技术特点,列出电梯在工程环
节中所需使用的资料,为工程本部编写 GVF-Ⅲ电梯工程技术资料提供依据。由于 GVF-Ⅲ
电梯在电气控制原理上与 GVF-Ⅱ电梯有较多的相同点,又基本使用 GVF-Ⅱ电梯的机械系
统,所以本资料对于相同点不再进行叙述,只作出说明“与 XX 电梯保持一致”。
本资料基本内容:
(1) GVF-Ⅲ电梯构成和技术特点。
(2) 安装部分。电气回路图的使用说明;控制柜及轿顶电器箱等重要电气部分的名
称、功能介绍;工程大、细线及地线的安装。
(3) 调试部分。运行前需进行检查的电梯各项安装情况,控制柜绝缘测试、低速试
运行、变频门机的调试运行、层高测定操作、高速运行调试、平层精度调整等。
如有修改意见,请填写附页的《GVF-Ⅲ电梯调试手册改进意见表》(复印有效),传真
或直接交由工程本部工程技术科以作修改。
目 录
一.GVF-Ⅲ电梯的技术概述··············································5
1.技术构成及特点··················································5
2.GVF-Ⅱ与 GVF-Ⅲ的简单比较········································6
2.1 机械部分的不同点············································6
2.2 电气方面不同部分的简单比较···································7
3.GVF-Ⅲ电梯的规格················································8
二.GVF-Ⅲ电梯机械部分的安装···········································8
三.GVF-Ⅲ电梯电气部分的安装···········································8
1.电气回路图的说明·················································8
1.1 电气回路图的类别和内容·······································8
1.2 控制柜对外的接线代号及用途···································9
1.3 电气回路图的读图方法·········································9
2.电梯电源参数····················································11
3.控制柜概要······················································12
3.1 控制柜尺寸及主要部件的安装图·································12
3.2 控制柜内部主要部件的名称和功能·······························14
4.轿顶电器箱元件布置图············································15
5.井道内器件、电缆的安装··········································16
5.1 井道内器件的安装与接线······································16
5.2 井道内电缆的安装············································16
6. 厅外召唤箱的安装、接线及 DIP 开关的设置·························17
7. 接地线作业·····················································17
7.1 控制柜内接地线回路图········································17
7.2 系统地线敷线图··············································18
8. 其他敷线························································18
四.运行调试···························································19
1. 运行前准备······················································19
1.1 运行前检查·····················································19
1.2 控制柜绝缘测试·················································19
1.2.1 准备工作··················································19
标记 处数
1.2.2 测试方法··················································19
1.2.3 各回路绝缘标准阻值········································20
1.3 电压测试························································21
1.4 混杂电压检查····················································21
2. 变频门机的调整···················································22
2.1 机械调整························································22
2.2 电气系统介绍····················································24
3. 低速试运行······················································26
3.1 开始低速运行····················································26
3.1.1 通电前准备·················································26
3.1.2 通电低速试运行·············································26
3.2 安全回路的确认··················································27
3.3 变频门机的门宽自检测············································27
3.4 变频门机开关门速度的调整········································27
3.5 变频门机的故障检出··············································28
4. 高速试运行前检查和调整··········································28
5. 高速试运行······················································29
5.1 层高测定························································29
5.1.1 层高测定运行前的确定······································29
5.1.2 层高测定的操作顺序········································29
5.2 层高测定前后的软件确认··········································29
5.3 高速试运行······················································30
5.4 电梯对重配置····················································30
5.5 平层调整························································30
5.6 起动补偿调整····················································31
5.7 轿内负荷检测设置···············································31
6. 起动舒适感调整··················································32
7. 功能确认························································32
五.MCUB 板使用说明····················································33
1. MCUB 板简介·····················································33
标记 处数
2. 小键盘介绍·····················································34
2.1 硬件介绍·······················································34
2.2 一般操作·······················································34
2.3 各状态解释·····················································35
六.艾默生变频器专用操作面板使用说明···································39
1. 操作面板硬件说明················································39
2. 按键功能说明···················································39
3. 指示说明························································40
4. 键盘操作说明···················································40
七.手持编程(GHP)操作说明············································42
1.手持编程(GHP)硬件说明··········································42
2.按键功能说明·····················································43
3.GHP 操作流程简介················································44
八.故障说明···························································44
1.电梯故障的内部处理方式···········································44
2.电梯故障代码表···················································45
3.变频器故障代码表·················································46