日立HGP电梯安装调试手册
日立HGP电梯安装调试手册
HGP 电梯安装调试手册 编号:GY081-05 P-1
前 言
本资料介绍 HGP 型电梯,该梯种以集成了变频控制和逻辑控制的 EV-ECD01(MCUB)
控制板、SCL 串行通讯系统和 RD-DMS01 变频门机系统作为电气的关键组成部分,并基本使
用了 GVF-Ⅱ型电梯的机械系统。
资料编写目的:随着 HGP 电梯的开发成功,在工程方面需要提供安装、调试、维修和
保养各项工作的技术说明。本资料是根据 HGP 电梯的技术特点,列出电梯在工程环节中所
需使用的资料。
HGP 电梯电气系统最大的特点是将 GVF-II 电梯中的 FMT(逻辑控制),TD3100(变频
控制),SCL-A(串行通讯)三个模块功能集成在一个板(MCUB 板)上,现场操作方法上有
较多不同,这方面的内容请参考 HGP 电梯《MCUB 板使用说明》、《艾默生变频器专用操作面
板使用说明》和手持编程器(GHP)《GHP 使用说明》;机械方面主要是使用同步电机,采用
了 2:1 吊挂方式,轿顶反绳轮、对重反绳轮、机房主机安装上存在不同,该部分的作业可
参照 NPM 进行。
由于 HGP 电梯在电气控制原理上与 GVF-Ⅱ、GVF-Ⅲ电梯有较多的相同点,又基本使
用 NPM 电梯的机械系统,所以本资料对于相同点不再进行叙述,只作出说明“与 XX 电梯
保持一致”。
本资料基本内容:
(1) HGP 电梯构成和技术特点。
(2) 安装部分。电气回路图的使用说明;控制柜及轿顶电器箱等重要电气部分的名
称、功能介绍;工程大、细线及地线的安装等。
(3) 调试部分。运行前需进行检查的电梯各项安装情况,控制柜绝缘测试、低速试
运行、变频门机的调试运行、层高测定操作、高速运行调试、平层精度调整等。
如有修改意见,请填写附页的《HGP 电梯调试手册改进意见表》(复印有效),传真
或直接交由工程本部工程技术科以作修改。
编写:孙德明
校对:郭志海
张 丹
审核
批准
HGP 电梯安装调试手册 编号:GY081-05 P-1
目 录
一.HGP 电梯的技术概述··············································4
1.技术构成及特点··················································4
2. HGP 与 NPM、GVF-Ⅱ的简单比较········································4
2.1 机械部分的不同点············································5
2.2 电气方面不同部分的简单比较···································6
3.HGP 电梯的规格················································7
二.HGP 电梯机械部分的安装···········································7
三.HGP 电梯电气部分的安装···········································7
1.电气回路图的说明·················································7
1.1 电气回路图的类别和内容·······································7
1.2 控制柜对外的接线代号及用途···································8
1.3 电气回路图的读图方法·········································8
2.电梯电源参数······················································10
3.控制柜概要······················································10
3.1 控制柜尺寸及主要部件的安装图·································10
3.2 控制柜内部主要部件的名称和功能·······························11
3.3继电器RYBD板元件布置图···········································11
4.轿顶电器箱元件布置图············································12
5.井道内器件、电缆的安装··········································13
5.1 井道内器件的安装与接线······································13
5.2 井道内电缆的安装············································13
6. 厅外召唤箱的安装、接线及 DIP 开关的设置·························14
7. 接地线作业·····················································14
7.1 控制柜内接地线回路图········································14
7.2 系统地线敷线图··············································15
8. 其他敷线························································15
四.运行调试···························································15
1. 运行前准备······················································15
1.1 运行前检查·····················································15
1.2 控制柜绝缘测试·················································15
1.2.1 准备工作··················································15
1.2.2 测试方法··················································16
1.2.3 各回路绝缘标准阻值········································16
1.3 电压测试························································17
HGP 电梯安装调试手册 编号:GY081-05 P-3
标记 处数
1.4 混杂电压检查····················································17
2. 变频门机的调整···················································17
2.1 机械调整···················································17
2.2 电气系统介绍····················································19
3. 低速试运行······················································21
3.1 磁极位置校正····················································21
3.2 低速运行··················································21
3.3 安全回路的确认驶················································22
3.4 变频门机的门宽自检测············································23
4. 高速试运行前检查和调整··········································23
5. 高速试运行······················································23
5.1 层高测定························································23
5.1.1 层高测定运行前的确定··········································23
5.1.2 层高测定的操作顺序·············································23
5.2 高速试运行······················································23
5.3 电梯对重配置····················································24
5.4 平层调整························································24
5.5 起动补偿调整····················································24
5.6 轿内负荷检测设置···············································24
6. 起动舒适感调整··················································25
7. 功能确认························································25
五.MCUB 板使用说明····················································25
1. MCUB 板简介·····················································25
2. 小键盘介绍·····················································27
2.1 硬件介绍·······················································27
2.2 一般操作·······················································27
2.3 各状态解释·····················································28
六.艾默生变频器专用操作面板使用说明···································31
1. 操作面板硬件说明················································31
2. 按键功能说明···················································32
3. 指示说明························································32
4. 键盘操作说明···················································33
七.手持编程(GHP)操作说明············································34
1.手持编程(GHP)硬件说明··········································34
HGP 电梯安装调试手册 编号:GY081-05 P-3
标记 处数
2.按键功能说明·····················································35
3.GHP 操作流程简介················································36
八.故障说明···························································36
1.电梯故障的内部处理方式···········································36
2.电梯故障代码表···················································37
3.变频器故障代码表·················································38
九.HGP 乘客电梯标准规格表················································39
- 上一篇:日立hgp电梯井道内每根线及随行电缆每根线的作用(详解) 2021/7/28
- 下一篇:日立HGP电气原理图 2021/7/27